Login       My Wishlist
  My Cart
$0.00 / 0 items
 
Birzula
Discussions Dedicated to Creative Books
 
International Access
Global Shipping Options Available
Home About Us News Our Blog Our Catalog My Cart My Account Track Shippment Contact Us
  Our Catalog   Home Improvement & Design   How-to & Home Improvements   Contracting

RSMeans Electrical Change Order Cost Data 2016


Blowout Sale! Save 53% on the RSMeans Electrical Change Order Cost Data 2016 by RS Means at Birzula. Hurry! Limited time offer. Offer valid only while supplies last. Means Electrical Change Order Cost Data 2016 This well organized reference provides over 20,000 unit cost entries for estimating change orders. With


Product Description

Means Electrical Change Order Cost Data 2016 This well organized reference provides over 20,000 unit cost entries for estimating change orders. With comprehensive, updated pricing, this is a great tool for both preand post installation change orders, and includes cost saving ideas and estimating recommendations. You'll also receive FREE quarterly updates via email a comprehensive quarterly report on market indicators and construction price trends.

Additional Information

Manufacturer:RS Means
Publisher:RS Means
Studio:RS Means
EAN:9781943215058
Item Weight:0 pounds
Item Size:1.1 x 10.9 x 10.9 inches
Package Weight:0.79 pounds
Package Size:5.85 x 0.73 x 0.73 inches

RSMeans Electrical Change Order Cost Data 2016 by RS Means

Buy Now:
RSMeans Electrical Change Order Cost Data 2016

Brand: RS Means
4.8 out of 5 stars with 33 reviews
Condition: New
Lead Time: 1 - 2 Business Days
Availability: In Stock
$219.99
$104.54
You Save: 52%


Quantity:  

 


View More In Contracting.

 


Have questions about this item, or would like to inquire about a custom or bulk order?


If you have any questions about this product by RS Means, contact us by completing and submitting the form below. If you are looking for a specif part number, please include it with your message.

First Name:
Last Last:
Email Address:
Your Message:

Related Best Sellers


ean: 9780070482340, isbn: 0070482349,
Change orders? Make sure you come out on top. Find out how to prevent change orders from eating into your firm's profits in Construction Change Orders: Impact, Avoidance, Documentation. Award-winning author and seasoned construction contractor James ...

ean: 9781572183391, isbn: 157218339X,
Current prices in dollars and cents and detailed descriptions for hard-to-find items needed on most insurance, repair, remodeling, and renovation jobs. All price items include labor, material, and equipment breakouts, plus special charts that tell yo...

ean: 9780784411896, isbn: 0784411891,
Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, third edition, provides information and recommendations on principles and procedures that are effective in enhancing the quality of constructed projects. The guide a...

ean: 9780876293577, isbn: 0876293577,
Professional guidance from a veteran spec home builder... A complete system to reduce risk and ensure profits in spec home building, no matter what the economic climate....

ean: 9781557019295, isbn: 1557019290,
Over 12,000 unit prices provide you with cost coverage for all aspects of construction -- from sitework and concrete, to doors and painting. The cost data is broken down into material and labor costs, to allow for maximum flexibility and accuracy in ...

ean: 9781405159203, isbn: 1405159200,
Most medium to large construction contracts include a claim for extra payment for variations or disruption to the programme. Whilst the causes of the claim are often well documented, what can and cannot be included in the payment is often misundersto...

ean: 9780071792387, isbn: 0071792384,
The latest methods for designing seismically sound structures Fully updated for the 2012 International Building Code, Geotechnical Earthquake Engineering Handbook, Second Edition discusses basic earthquake principles, common earthquake effects, and t...

ean: 9781260108804, isbn: 1260108805,
Fully updated coverage of construction planning techniques and equipment technologyConstruction Planning, Equipment and Methods, Ninth Edition, follows in the footsteps of previous editions by laying out the fundamentals of machine utilization and pr...

ean: 9780071762458, isbn: 0071762450,
The complete guide to trenchless technology project management, planning, costs, and methods Written by an expert in the field of pipeline system engineering, this book describes how to plan, schedule, and implement efficient, cost-effective trenchle...

ean: 9781557019356, isbn: 1557019355,
Now you can quickly and easily estimate the cost of all types of public works projects involving roads, excavation, utilities, street lighting, manholes, drainage systems and much more. This costbook is the first place to turn, whether you're prepari...



Privacy Policy / Terms of Service
© 2018 - birzula.info. All Rights Reserved.